Nuvadeo | Modern Swimwear for Every Body and Lifestyle
Nuvadeo | Modern Swimwear for Every Body and Lifestyle Nuvadeo | Modern Swimwear for Every Body and Lifestyle
Home Brand Zoggs
Cottesloe Mid Swim Jammer - Black zoggs swimwear for women, zoggs goggles and swimsuits

Cottesloe Mid Swim Jammer - Black

$ 28.00

$ 112.00

Unavailable
Cottesloe Mid Swim Jammer - Black zoggs swimwear for women, zoggs goggles and swimsuits

Cottesloe Mid Swim Jammer - Black

$ 28.00

$ 112.00

Size:
  • Waist Size 30
  • Waist Size 32
  • Waist Size 34
  • Waist Size 36
  • Waist Size 38
  • Waist Size 40
  • Waist Size 42
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

The Cottesloe Mid Swim Jammers from Zoggs, in classic black, are made for all year round swimming, they are made from durable Ecolast fabric, which is quick-drying, has UPF 50 sun protection and is 100% chlorine resistant. Designed with a drawstring for the perfect fit, and triangle front lining with 39cm leg length, they provide comfort and modesty.

FEATURES

  • 39cm leg length
  • 100% chlorine resistant
  • Triangle front lined
  • Drawstring - extra comfort
  • Quick drying
  • UPF 50 sun protection
  • Ecolast fabric: that features REPREVE yarn made from recycled plastic waste
  • Material: 55% Recycled Polyester 45% Polyester P.B.T

Note: The model is 6'1 and is wearing a size 32

You May Also Like

Cart
Nuvadeo | Modern Swimwear for Every Body and Lifestyle
Your cart is currently empty.